KIRIAST · DATA CENTER SOLUTIONS

Integrated data center safety and operations.

From very early smoke detection and cooling flow control to multi-vendor IT operations, KIRIAST organizes three specialist capabilities around clear system boundaries and project workflows.

For new builds, expansions and existing-site upgrades. Final configuration remains subject to site conditions, professional design and current manufacturer documentation.

DETECT
Securiton ASD 535-3 aspirating smoke detectorSecuriton ASD 535-4 aspirating smoke detector
CONTROL
GRUNER V2..ABV motorized butterfly valveGRUNER 930U intelligent electric actuator

CAPABILITIES

Three capabilities, each supported by visible source material.

Parameters, services and credentials are presented within their source boundaries without expanding listed categories into unverified authorization or project claims.

View capabilities
EARLY WARNING

Securiton

SecuriSmoke ASD aspirating smoke detectors: ASD 535-3, ASD 535-4, ASD 532 and ASD 531.

View details
FLOW CONTROL

GRUNER

V2..ABV butterfly valves with 910, 920 and 930U electric actuators.

View details
IT OPERATIONS

Beijing Yabowei

Equipment, spares, multi-vendor service, Xinchuang, AI operations and integration.

View details

EVIDENCE

Case studies

Review the projects, customers and service cases listed in Securiton, GRUNER and Beijing Yabowei material. Published fields remain visible; missing fields are not invented.

View all projects

DELIVERY

From scope confirmation to continuous improvement.

Confirm needs and boundaries, coordinate professional design and configuration, then close the loop with documentation, testing and operating feedback.

01

Define

Map project stage, critical areas, current systems, responsibilities and acceptance basis.

02

Configure

Confirm models, interfaces, points and deliverables against professional design and current product data.

03

Close the loop

Use test records, handover information, training and operating feedback to support ongoing management.

RESOURCES

Turn early questions into reviewable checklists.

Three featured guides help teams prepare inputs before consultation; the full resource center covers six priority questions plus an IT operations guide.

Browse resources
GUIDE 01

Fire detection guide

High airflow, sampling zones, model differences and confirmation points.

View details
GUIDE 02

Cooling control guide

Media, size, pressure, torque, control mode and environment.

View details
GUIDE 03

IT operations guide

Equipment scope, spares, incidents, migration, continuity and AI support.

View details

Project enquiry

Start the project with clear inputs.

Share the project stage, critical spaces, cooling architecture and current IT environment so we can frame boundaries.