Kidde Clean-Agent Fire Suppression
ECS 360 psi and Fluoro-K ECS-500 / ADS have separate product documents. Configuration, marine applicability, approval scope and compatibility require project-specific confirmation.
View detailsMARINE
KIRIAST supports shipowners, ship managers, shipyards and marine service companies with gas fire suppression, marine valves and actuators, spare parts and project coordination. Configuration, supply and marine applicability are confirmed for each project.
SCOPE
Spares, equipment renewal and new projects call for different model, interface, approval and delivery records. Establish the existing system and vessel requirements before confirming a product or supply scope with the relevant parties.
ECS 360 psi and Fluoro-K ECS-500 / ADS have separate product documents. Configuration, marine applicability, approval scope and compatibility require project-specific confirmation.
View detailsFrame fire-damper actuator and pipe valve or actuator requirements separately; exact products and approvals remain to be confirmed.
View detailsREQUIREMENTS
Provide nameplate, exact model, quantity and existing-system details to review compatibility and substitution boundaries.
Describe the existing system, retrofit window and control interfaces; site work and commissioning remain separate confirmations.
Share the protected area, design basis and class requirements for product and document review by the relevant parties.
Provide the brand, exact model or part number, quantity, existing system, application area, interface requirements, delivery location and target date. Mark unknown details as pending.
Product configuration, marine applicability, approval scope and compatibility are confirmed on a project-specific basis. Approval labels in literature do not replace checks of the applicable model, validity and vessel requirements.
COORDINATION
Requirements, manufacturer literature and RFQ inputs can be organized first. Availability, marine approvals, design support, field work and statutory testing each require separate confirmation.
The Kidde page identifies two manufacturer documents and their versions separately. Valve and actuator enquiries need model-specific nameplates, data sheets and project approval documents; unconfirmed records are not a supply commitment.
EMAIL ENQUIRY
Start a spares or project email enquiry and mark unknown details as pending.